
Primary
Restaurant frying retrofit
A pedestal or ceiling cobot beside the fryer you already run. Basket handling for fries, wings, and high-volume lines.
6-axis cobots · Irvine
ArmMate assesses the station, utilizes your existing equipment, designs the installation, installs the arm, and stays on the job after go-live.
Primary work: restaurant frying retrofits and CNC shop automation.
Arms we integrate
Integration partner. Not affiliated with or endorsed by the arm makers. See the footer disclosure.
Where we start

Primary
A pedestal or ceiling cobot beside the fryer you already run. Basket handling for fries, wings, and high-volume lines.

Primary
Machine tending for mills, lathes, and secondary ops. Load, unload, and keep the spindle in the cut through the shift.
Other system integration, including apple picking, pick and place, and machine load, is scoped the same way. See other industrial work
How it works
01
We walk the line, time the work, and name the constraint.
02
Cell layout, end effector, safety, and a program that fits the station.
03
We mount, integrate, and train your crew on the floor.
04
Service plans keep the cell running after go-live.
Outcomes
After go-live
Someone who knows the cell, during business hours, before anyone drives to the site. Remote support runs over an encrypted, customer-approved connection. No inbound ports are left open on your network.
Scheduled checks so the arm is not waiting on a breakdown to get attention.
A written response target for the day a technician needs to be on the floor.
From the cells
Basket handling beside a fryer, and a cobot tending a mill.


A site assessment is the first step. We will tell you if a cobot cell fits, and what it would take to install it.